Power Efficient Systems
Power Efficient Systems / Voltage Optimisation
Saving energy for others
 
01695 559785
postpesgroupltd.co.uk
get in touch

Receive our latest news and offers by e-mail

 

Reactive Power Charge

Reactive Power - Reactive Power Charges & Wattless Power

Reactive power charges sometimes known as Wattless Power or the CDCM Common Distribution Calculation Methodology are basically charges in the form of a financial penalty for operating an inefficient electrical supply, the penalties are issued in the form of a “Reactive Charge” or “Reactive Power Charge” which appear on a commercial type tariff and are usually charged one month in arrears.

Most DNO (Distribution Network Operators) who manage and distribute the power to users within the UK charge a penalty for operating an inefficient electrical supply called a “Reactive Power Charge”.

These Reactive Power charges can be removed by installing suitably rated Power Factor Correction equipment normally located on the main distribution system and fully automatic to react to the fluctuating loads

For additional information on “Reactive Charge” or “Reactive Power Charges” please contact us on 01695 559785, email us on postpesgroupltd.co.uk or see the links below:

 

Please choose a section below:

 
Page updated 23rd Oct 2011, 08:01
BRICK | instant websites

© 2012 Power Efficient Systems. All rights reserved.
http://www.pesgroupltd.co.uk/information/reactive-power-charge.html

Page updated 23rd Oct 2011, 08:01

Designed and maintained by Brick technology Ltd.
BRICK | Instant Websites